---
title: "Test Architect (TEA) Overview"
description: Understanding the Test Architect (TEA) agent and its role in BMad Method
---
The Test Architect (TEA) is a specialized agent focused on quality strategy, test automation, and release gates in BMad Method projects.
## Overview
- **Persona:** Murat, Master Test Architect and Quality Advisor focused on risk-based testing, fixture architecture, ATDD, and CI/CD governance.
- **Mission:** Deliver actionable quality strategies, automation coverage, and gate decisions that scale with project complexity and compliance demands.
- **Use When:** BMad Method or Enterprise track projects, integration risk is non-trivial, brownfield regression risk exists, or compliance/NFR evidence is required. (Quick Flow projects typically don't require TEA)
---
## Choose Your TEA Engagement Model
BMad does not mandate TEA. There are five valid ways to use it (or skip it). Pick one intentionally.
1. **No TEA**
- Skip all TEA workflows. Use your existing team testing approach.
2. **TEA-only (Standalone)**
- Use TEA on a non-BMad project. Bring your own requirements, acceptance criteria, and environments.
- Typical sequence: `*test-design` (system or epic) -> `*atdd` and/or `*automate` -> optional `*test-review` -> `*trace` for coverage and gate decisions.
- Run `*framework` or `*ci` only if you want TEA to scaffold the harness or pipeline.
3. **Integrated: Greenfield - BMad Method (Simple/Standard Work)**
- Phase 3: system-level `*test-design`, then `*framework` and `*ci`.
- Phase 4: per-epic `*test-design`, optional `*atdd`, then `*automate` and optional `*test-review`.
- Gate (Phase 2): `*trace`.
4. **Integrated: Brownfield - BMad Method or Enterprise (Simple or Complex)**
- Phase 2: baseline `*trace`.
- Phase 3: system-level `*test-design`, then `*framework` and `*ci`.
- Phase 4: per-epic `*test-design` focused on regression and integration risks.
- Gate (Phase 2): `*trace`; `*nfr-assess` (if not done earlier).
- For brownfield BMad Method, follow the same flow with `*nfr-assess` optional.
5. **Integrated: Greenfield - Enterprise Method (Enterprise/Compliance Work)**
- Phase 2: `*nfr-assess`.
- Phase 3: system-level `*test-design`, then `*framework` and `*ci`.
- Phase 4: per-epic `*test-design`, plus `*atdd`/`*automate`/`*test-review`.
- Gate (Phase 2): `*trace`; archive artifacts as needed.
If you are unsure, default to the integrated path for your track and adjust later.
---
## TEA Workflow Lifecycle
TEA integrates into the BMad development lifecycle during Solutioning (Phase 3) and Implementation (Phase 4):
```mermaid
%%{init: {'theme':'base', 'themeVariables': { 'primaryColor':'#fff','primaryTextColor':'#000','primaryBorderColor':'#000','lineColor':'#000','secondaryColor':'#fff','tertiaryColor':'#fff','fontSize':'16px','fontFamily':'arial'}}}%%
graph TB
subgraph Phase2["Phase 2: PLANNING"]
PM["PM: *prd (creates PRD with FRs/NFRs)"]
PlanNote["Business requirements phase"]
NFR2["TEA: *nfr-assess (optional, enterprise)"]
PM -.-> NFR2
NFR2 -.-> PlanNote
PM -.-> PlanNote
end
subgraph Phase3["Phase 3: SOLUTIONING"]
Architecture["Architect: *architecture"]
EpicsStories["PM/Architect: *create-epics-and-stories"]
TestDesignSys["TEA: *test-design (system-level)"]
Framework["TEA: *framework (optional if needed)"]
CI["TEA: *ci (optional if needed)"]
GateCheck["Architect: *implementation-readiness"]
Architecture --> EpicsStories
Architecture --> TestDesignSys
TestDesignSys --> Framework
EpicsStories --> Framework
Framework --> CI
CI --> GateCheck
Phase3Note["Epics created AFTER architecture,
then system-level test design and test infrastructure setup"]
EpicsStories -.-> Phase3Note
end
subgraph Phase4["Phase 4: IMPLEMENTATION - Per Epic Cycle"]
SprintPlan["SM: *sprint-planning"]
TestDesign["TEA: *test-design (per epic)"]
CreateStory["SM: *create-story"]
ATDD["TEA: *atdd (optional, before dev)"]
DevImpl["DEV: implements story"]
Automate["TEA: *automate"]
TestReview1["TEA: *test-review (optional)"]
Trace1["TEA: *trace (refresh coverage)"]
SprintPlan --> TestDesign
TestDesign --> CreateStory
CreateStory --> ATDD
ATDD --> DevImpl
DevImpl --> Automate
Automate --> TestReview1
TestReview1 --> Trace1
Trace1 -.->|next story| CreateStory
TestDesignNote["Test design: 'How do I test THIS epic?'
Creates test-design-epic-N.md per epic"]
TestDesign -.-> TestDesignNote
end
subgraph Gate["EPIC/RELEASE GATE"]
NFR["TEA: *nfr-assess (if not done earlier)"]
TestReview2["TEA: *test-review (final audit, optional)"]
TraceGate["TEA: *trace - Phase 2: Gate"]
GateDecision{"Gate Decision"}
NFR --> TestReview2
TestReview2 --> TraceGate
TraceGate --> GateDecision
GateDecision -->|PASS| Pass["PASS ✅"]
GateDecision -->|CONCERNS| Concerns["CONCERNS ⚠️"]
GateDecision -->|FAIL| Fail["FAIL ❌"]
GateDecision -->|WAIVED| Waived["WAIVED ⏭️"]
end
Phase2 --> Phase3
Phase3 --> Phase4
Phase4 --> Gate
style Phase2 fill:#bbdefb,stroke:#0d47a1,stroke-width:3px,color:#000
style Phase3 fill:#c8e6c9,stroke:#2e7d32,stroke-width:3px,color:#000
style Phase4 fill:#e1bee7,stroke:#4a148c,stroke-width:3px,color:#000
style Gate fill:#ffe082,stroke:#f57c00,stroke-width:3px,color:#000
style Pass fill:#4caf50,stroke:#1b5e20,stroke-width:3px,color:#000
style Concerns fill:#ffc107,stroke:#f57f17,stroke-width:3px,color:#000
style Fail fill:#f44336,stroke:#b71c1c,stroke-width:3px,color:#000
style Waived fill:#9c27b0,stroke:#4a148c,stroke-width:3px,color:#000
```
**Phase Numbering Note:** BMad uses a 4-phase methodology with optional Phase 1 and documentation prerequisite:
- **Documentation** (Optional for brownfield): Prerequisite using `*document-project`
- **Phase 1** (Optional): Discovery/Analysis (`*brainstorm`, `*research`, `*product-brief`)
- **Phase 2** (Required): Planning (`*prd` creates PRD with FRs/NFRs)
- **Phase 3** (Track-dependent): Solutioning (`*architecture` → `*test-design` (system-level) → `*create-epics-and-stories` → TEA: `*framework`, `*ci` → `*implementation-readiness`)
- **Phase 4** (Required): Implementation (`*sprint-planning` → per-epic: `*test-design` → per-story: dev workflows)
**TEA workflows:** `*framework` and `*ci` run once in Phase 3 after architecture. `*test-design` is **dual-mode**:
- **System-level (Phase 3):** Run immediately after architecture/ADR drafting to produce `test-design-system.md` (testability review, ADR → test mapping, Architecturally Significant Requirements (ASRs), environment needs). Feeds the implementation-readiness gate.
- **Epic-level (Phase 4):** Run per-epic to produce `test-design-epic-N.md` (risk, priorities, coverage plan).
Quick Flow track skips Phases 1 and 3.
BMad Method and Enterprise use all phases based on project needs.
When an ADR or architecture draft is produced, run `*test-design` in **system-level** mode before the implementation-readiness gate. This ensures the ADR has an attached testability review and ADR → test mapping. Keep the test-design updated if ADRs change.
---
## Why TEA is Different from Other BMM Agents
TEA is the only BMM agent that operates in **multiple phases** (Phase 3 and Phase 4) and has its own **knowledge base architecture**.
### Phase-Specific Agents (Standard Pattern)
Most BMM agents work in a single phase:
- **Phase 1 (Analysis)**: Analyst agent
- **Phase 2 (Planning)**: PM agent
- **Phase 3 (Solutioning)**: Architect agent
- **Phase 4 (Implementation)**: SM, DEV agents
### TEA: Multi-Phase Quality Agent (Unique Pattern)
TEA is **the only agent that operates in multiple phases**:
```
Phase 1 (Analysis) → [TEA not typically used]
↓
Phase 2 (Planning) → [PM defines requirements - TEA not active]
↓
Phase 3 (Solutioning) → TEA: *framework, *ci (test infrastructure AFTER architecture)
↓
Phase 4 (Implementation) → TEA: *test-design (per epic: "how do I test THIS feature?")
→ TEA: *atdd, *automate, *test-review, *trace (per story)
↓
Epic/Release Gate → TEA: *nfr-assess, *trace Phase 2 (release decision)
```
### TEA's 8 Workflows Across Phases
**Standard agents**: 1-3 workflows per phase
**TEA**: 8 workflows across Phase 3, Phase 4, and Release Gate
| Phase | TEA Workflows | Frequency | Purpose |
| ----------- | --------------------------------------------------------- | ---------------- | ---------------------------------------------- |
| **Phase 2** | (none) | - | Planning phase - PM defines requirements |
| **Phase 3** | \*framework, \*ci | Once per project | Setup test infrastructure AFTER architecture |
| **Phase 4** | \*test-design, \*atdd, \*automate, \*test-review, \*trace | Per epic/story | Test planning per epic, then per-story testing |
| **Release** | \*nfr-assess, \*trace (Phase 2: gate) | Per epic/release | Go/no-go decision |
**Note**: `*trace` is a two-phase workflow: Phase 1 (traceability) + Phase 2 (gate decision). This reduces cognitive load while maintaining natural workflow.
---
## TEA Command Catalog
| Command | Primary Outputs | Notes |
| -------------- | --------------------------------------------------------------------------------------------- | ---------------------------------------------------- |
| `*framework` | Playwright/Cypress scaffold, `.env.example`, `.nvmrc`, sample specs | Use when no production-ready harness exists |
| `*ci` | CI workflow, selective test scripts, secrets checklist | Platform-aware (GitHub Actions default) |
| `*test-design` | Combined risk assessment, mitigation plan, and coverage strategy | Risk scoring + optional exploratory mode |
| `*atdd` | Failing acceptance tests + implementation checklist | TDD red phase + optional recording mode |
| `*automate` | Prioritized specs, fixtures, README/script updates, DoD summary | Optional healing/recording, avoid duplicate coverage |
| `*test-review` | Test quality review report with 0-100 score, violations, fixes | Reviews tests against knowledge base patterns |
| `*nfr-assess` | NFR assessment report with actions | Focus on security/performance/reliability |
| `*trace` | Phase 1: Coverage matrix, recommendations. Phase 2: Gate decision (PASS/CONCERNS/FAIL/WAIVED) | Two-phase workflow: traceability + gate decision |
---
## Related Documentation
- [Setup Test Framework](../../how-to/workflows/setup-test-framework.md) - How to set up testing infrastructure
- [Run Test Design](../../how-to/workflows/run-test-design.md) - Creating test plans